Max. Lifting Height: | 52m |
---|---|
Rated Loading Capacity: | 85t |
Certification: | ISO9001, CE |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Item | Unit | Parameter value |
Parameter Item | - | XGC85 |
Operation performance parameter | * | |
Max. rated lifting capacity for boom | (t) | 85 |
Max. rated lifting capacity for fixed jib | (t) | 12 |
Max. rated lifting capacity for luffing jib | (t) | - |
Max. load moment | (t.m) | 341 |
Max. rated lifting capacity for tower jib | (t) | - |
Max. rated lifting capacity for boom single top | (t) | 8 |
Max. rated lifting capacity for special jib | (t) | - |
Dimension parameter | * | |
Boom length | (m) | 13~58 |
Boom luffing angle | (°) | -3~80 |
Fixed jib length | (m) | 7~19 |
Tower jib length | (m) | - |
(m) | 13.05×3.4×3.3 | |
Max. dimension of single unit in transport state(L×W×H) | ||
Fixed jib offset angle | (°) | 10,30 |
Special jib length | (m) | - |
Speed parameter | * | |
Max. single line speed for hoist mechanism | (m/min) | 120 |
Max. single line speed for boom luffing mechanism | (m/min) | 70 |
Max. single line speed for jib luffing mechanism | (m/min) | - |
Max. slewing speed | (r/min) | 2 |
Max. travel speed | (km/h) | 0.9 |
Grade ability | (%) | 30 |
Mean ground pressure | (MPa) | 0.087 |
Max. single line speed for tower jib luffing mechanism | (m/min) | - |
Max. single line speed for superlift luffing | (m/min) | - |
Engine | * | |
Model | - | SC9DK270G3/QSC8.3 |
Engine power | (kW) | 200/183 |
Emission | - | |
National III/ EU III | ||
Mass parameter | * | |
Overall crane mass | (t) | |
71.5(main hook, 13m boom) | ||
Max. mass of single unit in transport state | (t) | 41.2 |
Suppliers with verified business licenses